Tough task: TNB maintenance personnel in action in Rawang. The firm spends RM40mil every year to remove sediment such as sand and rubbish to keep its Cameron Highlands hydro dam capacity running at optimum level.皇冠体育信用(www.hg9988.vip)是一个开放皇冠网址即时比分、皇冠网址代理最新登录线路、皇冠网址会员最新登录线路、皇冠网址代理APP下载、皇冠网址会员APP下载、皇冠网址线路APP下载、皇冠网址电脑版下载、皇冠网址手机版下载、皇冠体育信用官方平台。
Tenaga Nasional Bhd (TNB) continues to contend with unforeseen expenditure in running hydroelectric (hydro) dams in the country, as an increasing level of water pollution has become a growing issue.
Despite this, the group’s power generation unit, TNB Power Generation Sdn Bhd (TNB Genco), acknowledges that hydro dams are considered an important source of renewable energy.
,,新2足球app(www.hg9988.vip)实时更新发布最新最快最有效的新2足球网址,新2足球app下载,包括新2手机网址,新2备用网址,皇冠最新网址,新2足球网址,新2网址大全。
- 发表评论
-
- 最新评论 进入详细评论页>>